Latest News
2010 Review
Pictures of some of the projects completed during 2010

Part of the main distribution board for Broxbourne Canoe Slalom course being constructed for the London Olympics, now renamed as Lee Valley Whitewater Centre.

Generator distribution board for the Telecoms Building at Burj Dubai.

Two Variable Speed Drive sections, complete with Ramp for ABB drive modules.

Motor Control Centre with Top Front Entry ACB's and associated cable extension boxes.

Dual Changeover cubicle with bypass and generator incomer.

Auto-changeover (mains/generator) with bypass.

Soft start cubicle internal layout.

Special plinth with gland plates.

Front Access distribution cable boxes (normally hidden in cableway).

Large external cable boxes.

Special auto/manual changeover and fusebases.

External generator connection box on small Motor Control Centre.

Motor Control Centre with mains/generator incomers (generator cables enter via cat-flap).

Part fixed and part withdrawable motor control centre.

Standard UCC50 motor control centre.

Front Access Motor Control Centre with ICA section and drive sections.

Three columns of distribution.

Front Access Spacesaver MCC

Small distribution front access.

Small MCC (Two pump panel).

UCC25

Switchboard extension column.

Top entry distribution

Multi-compartment two pump panel, on supporting frame.

UCC50 Motor Control Centre with ACB incomer section.

UCC50 with drive sections.

Wardrobe section of a Motor Control Centre used for ICA/PLC etc.

High density withdrawable Motor Control Centre.