Picture Gallery - April 2008

Motor Control Centre for a water project in Nigeria - overall length of this board nearly 12m.

Small MCC for Scottish Water. This is a popular colour, also used this month for a board for an RAF base (not shown) and 2 other Scottish Water jobs.

Front View
Rear View

630A feeder switches for a UK power station project.

Completed Power Station Job. The 2 ACB sections in the centre form part of a ring main - cables come in and out onto cross-connection busbars behind the louvred panels. This is at LV (400V) and is the 4th such panel we have built for the same end user.

Part of a Motor Control Centre for a UK water company. Finished board is in 2 parts which face each other, connected via a 2m long overhead bridge. The 2 legs are 11m and 8m long. Drive units shown above are each 250KW.

Part of a 9.5m long MCC for Scottish Water.

Incomer sections for the above Scottish Water MCC - Incorporating special arrangements for Supply Authority C.T.'s

The bottom LH cover has sealing facilities (anti-tamper).

 

Special height and width (575mm)

units for generator controls.

Dual Incomer Fuseswitches for a Back-to-Back MCC.

This was another one for Scottish Water, 7m long but having 43 starter/feeder compartments, (including 7 variable speed drives) and a PLC/ICA section.

Single Section Distribution with a large viewing window, built for a chemical works.

The incomer ACB (1600A) not shown.