Latest News
Picture Gallery - February 2010
Pictures of recently completed jobs

Drive suite, including ACB incomer section. These units are to be installed in a special container for ease of installation, and connected together with an overhead bridge.

Here is the bridge section in position (in our workshop) to ensure it all lines up. Very tight space between units!

Control panels for a tunnel ventilation project.

Small MCC for Severn Trent.

Interlocked incomer units (ACB's are cable interlocked to ensure only 2 of the 3 can be closed at any one time).

Rear External Cable boxes for a quarrying site.

Front view of part of the board for a UK quarry.

Package sub being wired up in Boultings workshop. Shows transformer sections (with fronts removed) and overhead busbar bridging units.

Part of the main switchboard for a cable tunnel project, finished length 12m. Incomers are 3200A (3 off).

Drive sections - part of an MCC containing over 25 such sections, arranged back-to-back. All the drives are to control fans as part of the tunnel ventilation project.

An MCC for an overseas oil industry project.

Test assembly in our workshop of a bridge unit between 2 parts of a large motor control centre. The 2 legs are each side are nearly 10m long, so this makes best use of the space available. The end user site is a distillery project in Scotland.