Latest News
Picture Gallery - January 2010
Pictures of recently completed jobs

Drive unit enclosures for 400kW and 160kW pumps to be used for the Broxbourne White Water Canoe slalom course - London 2012 Olympics. These first units are being sent early for string testing with the motors and pumps.

Withdrawable Motor Control Centres for Cement plants in Scotland.

Part of a Motor Control Centre (UCC50) for a Yorkshire Water Treatment Works.

Fixed Pattern MCC for a Gas Turbine Auxiliary Control Board, including DC starter motor.

Extension columns of Motor Control Centre for an existing Yorkshire Water site.

UCC25 Motor Control Centre for Severn Trent Water.

Wall boxes for additional work at a UK airport.

UCC25 Motor Control Centre for a Thames Water project - doors still awaiting details before we punch them.

Rear view of another UCC25 Motor Control Centre for Thames, showing the rear hinged cableway facility.

Third UCC25 Motor Control Centre for Thames, Mains incomer on left, generator incomer flap bottom of next column.

Close up of the 400A incomer fuseswitch (Socomec) showing shrouding facility - both sides of the switch could be live when door opened, even though the switch is off, due to dual supply.

UCC25 Motor Control Centre for a Severn Trent project.


4 x Distribution Boards for Royal Bolton Hospital as part of an expansion in their maternity unit.

Extension column for Fleetwood project. To the right is part of our stores Kan-Ban system.

More of the drive cubicles for Broxbourne Canoe Slalom course. These are the large ones for the Olympic course. Another (smaller) set of drives is used for the intermediate course.
