Latest News

Picture Gallery - May 2009

Pictures of recently completed jobs.

Small UK Water MCC

Back-to-back Motor Control Centre for a waste to recycling scheme. The plant uses intelligent controls so that door indications are minimal.

Another MCC for the waste recycling project.

Large PLC/Control section - W2R plant.

Part of a UK power station upgrade project - the doors all have additional knurled screw fixings and a standard padlocking facililty.

Power Station project - Incomer Power Station - Back-to-back incomers connected by overhead bridge.

Withdrawable MCC - Export project.

Small MCC for Scottish Water - this one is bound for Assynt in the North West Highlands.

Part of another MCC for Assynt (Scottish Water). Overall length is 11m when complete.

Board for a Nuclear site - note overhead bridge sections which will face each other when assembled on site due to severe space restrictions. 50KA 3 second rating.

Corner sections for a Data Centre (4000A, 80KA) which will also house the PFC equipment.

Motor Control Centre for ODA Pumping Station (Olympic site - London). Incomers on the left are mains and generator, then there is a corner unit. Variable Speed Drive sections are 110KW (4 off). This board will be housed in a circular building so has been arranged to follow the curve of the outer wall. The room is about 20m in diameter.

Rear view showing special "wedge" section top boxes to create the curve.