Latest News
Picture Gallery - September 2008
Latest pictures of recent jobs completed:-

Pump controls MCC. The two large drives are 110KW Variable Speed.

Extension columns for a UK data centre, "critical switchboard". The switches are withdrawable units so they can be changed/maintained easily in future.

New Air Circuit Breaker incomer columns for a water treatment works, complete with special joggle on left hand side. This is to connect to an existing board which was built many years ago by others. The existing incomer switches need to be replaced, but to reduce downtime these new ones will be installed before the old ones are removed.

Withdrawable units for an offshore project. These are popular for plant where high availablity is required as they can allow quicker diagnosis and repair in the event of a fault.

Membrane Plant MCC for a Scottish Water project.

Completed units being prepared for despatch from Rolla.

Part of a Motor Control Centre for a Scottish Distillery upgrade project.

Another of the MCC's for the Distillery.

Power Distribution Unit (PDU) for a data centre project.

MCC Incomer sections for a glass factory.

MCC for a UK water treatment plant upgrade.