Latest News

Picture Gallery - September 2009

Pictures of recently completed jobs

Switchboard for a University Building in Manchester.

Motor Control Centre for Scottish Water. Three variable speed drives are rated at 75KW.

Small MCC including mains/generator changeover, some small variable speed drives, some fixed speed drives, and controls/instrumentation section on the right.

Small switchboard for a Hospital Upgrade.

Large Back-to-Back MCC - almost complete, just some doors to fit.

Some of the feeder sections of a large switchboard for a UK Oil Refinery. All devices are withdrawable types.

Motor Control Centre for a treatment works in Scotland.

One of two identical Motor Control Centres to be used as the AC auxiliary boards for a gas turbine power station. Most of the starter compartments are withdrawable type. The site is overseas.

Part of a Motor Control Centre for a Severn Trent Water site.

Motor Control Centre/Distribution switchboard for a UK chemical works.

Suite of drive cubicles - UK water company.

Back-to-back MCC - this is the front view.

One of two generator control sections, 2500A, cabling in top front, out top rear. Stand alone units.